Product Description
CPE Cast Film Extrusion Line
Applications of product
CPE Composite Base Film
It is designed for lamination with BOPA, BOPET, BOPP and other materials, followed by heat sealing and bag making. Widely applied in food packaging, clothing packaging and related industries.
CPE Single-layer Printing Film
After processes like thermal printing, heat sealing and bag forming, this film is suitable for packaging applications such as roll paper carry bags and individual tissue wrapping.
CPE Aluminum Coated Film
This film is widely used in soft packaging, composite packaging, decorative purposes, laser holographic anti-counterfeiting, laser embossing (laser stamping) and other anti-counterfeiting or decorative fields.
Production line Specification
Model |
Width of Die- mm |
Products width-mm |
Products thickness-mm |
Max line speed m/min |
Max Capacity-- kg/h |
JCF-2500 PE |
2500 |
2200 |
0.02-0.15 |
250 |
600 |
JCF-3000 PE |
3000 |
2700 |
0.02-0.15 |
200 |
750 |
JCF-3500 PE |
3500 |
3200 |
0.02-0.15 |
200 |
900 |
FAQ (Part One)
Question 1: What are the requirements for electricity, water, and air consumption of the machines?
Jwell understands the significance of energy parameters in project planning. We offer comprehensive layout solutions for extrusion projects, which not only cover the overall workshop planning but also include detailed data on the power load, water consumption, and air consumption required by the equipment. Our technical team will customize precise energy demand plans according to the selected equipment models, production scale, and process requirements, ensuring a scientific and reasonable allocation of workshop resources and facilitating the efficient operation of the project.
Question 2: Can I operate the machines without experienced engineers?
Even if you lack a professional engineering team, there's no need to worry about equipment operation. Jwell can dispatch a sufficient number of professional engineers to your factory within a short period (5 - 15 days). These engineers not only have solid knowledge of equipment operation and maintenance but also provide on - site training, guiding your team to master equipment operation skills step by step. Additionally, you can arrange for your engineers to participate in systematic training courses at Jwell's factory. The courses cover equipment principles, operation specifications, daily maintenance, and common fault handling, ensuring that your team can operate and maintain the equipment proficiently and safely.
Question 3: Can we conduct quality inspections and trial runs before shipment?
Absolutely! Jwell has strict quality control over its products. We promise to conduct 100% operational tests and quality inspections on each piece of equipment before shipment. During the trial run, our technicians will simulate actual production conditions and comprehensively test all performance indicators of the equipment to ensure stable operation and compliance with performance standards. Each piece of equipment will be accompanied by a detailed test report, giving you a clear understanding of the equipment quality and allowing you to receive the equipment with confidence for production.
Question 4: Is it safe to use Jwell's machines?
Jwell always regards product safety and quality as top priorities. The company adopts the ISO international quality management system and 6S production management mode. Every link, from raw material procurement, production processing to finished product inspection, strictly follows standard procedures. Meanwhile, our equipment complies with international quality and safety standards such as CE and UL. It has passed strict safety performance tests and is equipped with comprehensive safety protection devices and emergency braking systems, providing all - round safety guarantees for operators and enabling you to use the equipment with peace of mind.
Question 5: How can we obtain spare parts for the equipment?
Jwell's equipment uses components from internationally renowned brands such as Siemens, Omron, and Delixi, which can be conveniently purchased worldwide. If you have difficulty sourcing locally, we can quickly deliver the spare parts to you via international renowned couriers like DHL, FedEx, TNT, or by air freight. We also have a professional after - sales spare parts management system to ensure sufficient inventory and timely delivery, minimizing equipment downtime caused by a shortage of spare parts and guaranteeing the continuity of your production.
FAQ (Part Two)
Question 1: Is Jwell Machinery a Manufacturer?
Yes, Jwell is a manufacturer. All key components of the extrusion line are produced in - house. We own 8 manufacturing bases and a sales center located in Shanghai, Haining, Suzhou, Changzhou, Zhou Shan, Chuzhou, Foshan, and Quanjiao, China. Since creating the first Chinese screw and barrel under the "Jinhailuo" brand in 1978, after over 40 years of development, Jwell has grown into one of China's largest extrusion machine suppliers, boasting 300 design and test engineers and 3000 employees. We've become a premier provider of extrusion lines and a reliable business partner. Welcome to visit us!
Question 2: Can Jwell Machinery provide customized extrusion lines?
Absolutely! If you don't find what you need on our website or have specific requirements, we offer bespoke services. Simply send us your detailed requirements via email. Our R & D team continuously innovates, developing new machinery monthly, some of which may not yet be updated online. We'll assess feasibility and work with you to create the perfect solution.
Question 3: How can I place an order and make payments?
Once we've clarified your requirements and determined the ideal extrusion line for you, we'll send you technical solutions and a Proforma Invoice. You can choose to pay via TT bank transfer or LC (Letter of Credit) according to your preference.
Question 4: How do you ensure machinery and service quality?
Our machines adhere to European standards and follow German - style business practices. We collaborate with international renowned brands like Siemens, Flender, Omron, ABB, WEG, Falk, and FUJI. Our company continuously imports over 1000 international first - class high - precision processing equipment, such as multistage machining centers, CNC lathes, and CNC milling machines from Korea and Japan. All processes strictly comply with CE certification, ISO9001 and 2008 quality management systems. Additionally, we offer a 12 - month quality warranty, test machine performances before every delivery, and our service engineers are always on standby to assist.
Question 5: What is the average delivery time?
The delivery time usually ranges from 1 - 4 months, depending on the type of machinery, starting from the receipt of the order advance payment.
Question 6: What are the long - term operating costs related to energy consumption?
Our technical team provides detailed energy consumption data for each extrusion line model during the layout planning phase. The electricity, water, and air consumption are optimized based on the latest energy - saving technologies. For example, our advanced screw design and intelligent control systems reduce power consumption by up to 20% compared to traditional models. We can also offer energy - efficiency reports to help you estimate long - term operating costs accurately.
Question 7: How often does Jwell update its technology, and can existing equipment be upgraded?
Jwell invests heavily in research and development, introducing new technologies and improvements regularly. We release new machinery models every month. For existing equipment, we offer upgrade services. Our engineers can assess your current machines and provide upgrade solutions that enhance performance, increase production capacity, or improve energy efficiency. This way, you can keep your production lines competitive without a complete overhaul.
Question 8: What if I encounter technical problems during the warranty period?
During the 12 - month warranty period, if you encounter any technical problems, simply contact our 24/7 customer service hotline. Our team of over 300 technical testing engineers, who are constantly traveling globally, will respond promptly. We'll provide remote support first; if needed, we'll dispatch engineers to your site as soon as possible to diagnose and fix the issue, ensuring minimal disruption to your production.
Question 9: Are there any additional training programs for operators after the initial training?
Yes, in addition to the initial training provided at your factory or ours, we offer continuous training programs. As new features are added to our equipment or industry - best practices evolve, we organize online and on - site training sessions. These sessions cover advanced operation techniques, troubleshooting skills, and the latest safety regulations, ensuring your operators stay updated and can maximize the performance of our machinery.
Question 10: How does Jwell handle environmental protection requirements in its production and equipment?
Jwell is committed to environmental protection. Our production processes comply with strict environmental standards, minimizing waste and emissions. In terms of our equipment, we design extrusion lines with energy - saving and low - emission features. For example, our ventilation systems are optimized to reduce volatile organic compound (VOC) emissions, and waste heat recovery technologies are integrated to reuse energy, helping your production meet environmental regulations while being cost - effective.





Packing
- Packing Way of Cast Film Production Line with CE/ISO:
The entire production line is packed in compliance with CE and ISO standards to ensure safety during transportation.
- Wood Pallet for Main Extruders:
Main extruders are fixed on solid wood pallets, which are reinforced with strapping bands to prevent displacement. The pallets meet international shipping standards for load-bearing capacity.
- Wooden Case for Other Parts:
Auxiliary parts (such as screws, barrels, electrical components) are packed in customized wooden cases. The interior is lined with shock - absorbing materials (e.g., foam or kraft paper) to protect against impact.
- Container Loading & Sea - worthy:
All packed items are loaded into standard shipping containers (20ft/40ft) with proper bracing and lashing to withstand sea transportation. The packing is designed to be moisture - proof and resistant to corrosion, ensuring the equipment remains in good condition throughout the voyage.